Gallery


A selection of images showing various stages of the project and processes involved in building the new public sewer system.
Tank install prep work
Setting STEP tank
Excavating for tank install
Delivering STEP tank to site
Installing pipe on Pier One Road
Installing pipe on Pier One Road
Community main- Elm Street
Community line cleanout being installed
Transmission line being moved down RT 8
Transmission line being moved down RT 8
Transmission line being moved down RT 8
Transmission line being moved down RT 8
Transmission line being moved down RT 8
Transmission line being moved down RT 8
Transmission line being moved down RT 8
Transmission line being moved down RT 8
Transmission line being moved down RT 8
Transmission line being moved down RT 8
Transmission line being moved down RT 8
SKI Office
HDPE pipe bend test equipment
HDPE pipe bend test result
Open cut near Woodmoor
Tank placement on Margaret Road
Tank Placement on Margaret Road
Project Groundbreaking
Groundbreaking
Groundbreaking
Project Partner
HDPE Open Cut along trail
Aerial of line installation
Aerial of line installation
Aerial of line installation
Line installation
Line installation
Milling machine
HDD rig
A Hydrostatic Test is performed on each tank to ensure tank is properly sealed and does not leak.
Trench
Pipe install
Sewer Drain Field Intrusion
Sewer Drain Field Intrusion
Pipes for cut
STEP Tank placement at KIE Community Club
STEP Tank placement
Carroll & Pennick Roads rough restoration
Carroll & Pennick Roads rough restoration
16″ KDPE pipe fusion process
Directional drilling under RT 50
Directional drilling under RT 50
Directional drilling under RT 50
Community Mains
Community Mains
Horizontal Directional Drill- note the steel rod penetrating into the ground just to the right of the excavator as it goes under Rt. 50
Receiving Pit- the black sewer pipe is connected to the end of the steel rod from the Drill Rig and is pulled back under Rt. 50
Overview- note the Drill Rig behind the eastbound tractor-trailer
Community main on Claiborne Road
STEP installation on Harford
Rt 50 bore and pull back
STEP Installation
STEP Installation
STEP Installation
STEP Installation
STEP Installation
Award Winning Project
STEP Installation
STEP Installation
Community Main Installation
Transmission Installation
Tank install
Community line 3″ pipe reduced to 2″ pipe
Night work at airport
Night work at airport
Night work at airport
Southern Kent Island (SKI) Step Tank Pump Electrical Disconnect