Month: November 2019

SKI Project Update 11.22.19

16-01 STEP This week the contractor completed 5 house connections to the Public Sewer System and installed Four STEP tanks on Queen Anne and Point Road. The contractor installed 170LF of 4” gravity sewer line to those individual homes along with completing 5 septic tank…

SKI project update 11.15.19

STEP During the first two weeks of November the contractor completed 6 house connections to the Public Sewer System and installed Five STEP tanks on Bay Drive and Queen Anne Road.   The contractor installed 326LF of 4” gravity sewer line to those individual homes…

SKI Project Update 11.1.19

STEP This week, the contractor completed 5 Public Sewer house connections and installed four STEP tanks on Queen Anne Road.  Five STEP assemblies with pumps were installed on Queen Anne Road in addition to 92LF of 4” gravity sewer line installed to those individual homes. …