Month: April 2018

Project Update 04.27.18

STEP Contractor installed 5 tanks on Talbot and Wicomico Roads for the week. The contractor also installed about 590lf of 1” service line from previously installed tanks to the street on Oregon Road. Contractor will continue installing tanks on Wicomico next week. Electrical connections…

SKI Project Update 4.20.18

16-01 Contractor installed 5 tanks for the week on Wicomico Road.  They also ran about 500lf of 1″ service lines from the street to previously installed tanks.  The contractor also changed out 6 electrical meter boxes on New Jersey.  Electric meter modifications / change…

Project update 4.13.18

STEP Contractor started with the electric meter modification this week on New Jersey.  Four meter pans were changed out and one was modified.  All 5 now have the sewer disconnect breaker installed on the side or bottom of the meter can.  The contractor also…

Project Update 4.6.18

STEP Contractor installed 9 tanks on Talbot and Worcester Roads for the month.  The total number of tanks installed to date 234.  They also installed approximately 1300 lf of 1″ service line from previously installed tanks to the road on Maryland Road.  Contractor has…